This project included the addition of a new surgical center and clinic. It consisted of adding two Aaon rooftop units and a pack-aged chiller unit to provide heating and cooling to the facilities. Our plumbers and pipefitters installed all the piping systems consisting of potable water, drainage, waste & venting, medical gas as well as the heating and cooling piping loops for the VAV coils, rooftop units and chillers while our sheet metal crew installed all the air handling systems. Additional work was also completed in the existing hospital with renovation to the existing emergency room treatments areas. Construction time of this project was 3 years.
Responsibility:
Mechanical Contractor
Date Completed:
September 2010
General Contractor:
Capital City Construction
Bismarck, ND
Owner:
West River Regional Medical Center
Hettinger, ND
Mechanical Engineer:
Beazley Engineering
Bismarck, ND
Architect:
Jiran Architects & Planners
Bismarck, ND