This is a clinic that opened the doors in October of 2011. With this brand new facility located on the Fort Berthold Indian Res-ervation, this state of the art clinic is equipped with a geothermal heating and cooling system which includes 27 heat pumps and an energy recovery unit. This project is a LEED certification project.
Responsibility:
Mechanical Contractor
Date Completed:
August 2011
General Contractor:
Comstock Construction
Fargo, ND
Owner:
US Army Corps of Engineers
Rapid City, SD
Mechanical Engineer:
HDR Engineering
Denver, CO
Architect:
HDR Architecture
Denver, CO